
Reducing the manufacturing time of pump parts using 3D printing technology by the Swiss company Salzer Challenge: Supply stainless steel shielding pump used in the mine important things: The original case is welded and painted by hand The supply time of this part from the main manufacturer is between 6 to 8 weeks, while stopping the line in the mine is associated with a lot of financial losses and should be minimized. Salzer’s solution: The company used “incremental manufacturing” technology to solve the problem and produced the desired part by performing a three-dimensional scan of the original part and using acrylonitrile styrene acrylate. :important things . The color of the new piece is yellow and does not need to be painted The new production piece has more corrosion resistance than the original sample, which is made of stainless steel. Compared to traditional production models, the new part is very carefully designed and produced to fit the installation site. . Part supply time is reduced Source: Telegram channel of pump industry events @PumpIndustryEvents